Installation
Installlation Drawings: Engineered installation drawings are included for each area where the product is to be installed
Pre-Installation Proceedure: The mounting surface shall be secure and rigid. All areas where the closure angles are to be mounted need to be free of surface obstacals that would impair a tight secure installation
Installation Proceedure: Use only qualified Journeyman Installers for the installation proceedure. Layout and install the *** enter here ***. Clean and dress any exposed welds prior to paint touchup
Final Finish: It is the OWNERS responsiblity for the paint type, color and application